8. In the cases referred to in section 5, where a storm sewer main connected to a combined sewer system is replaced, the acceptance tests and criteria for that main are those provided for in section 11.2 of the standard specification, referred to in section 21 of this Regulation, for the combined and sanitary sewer mains.